Loading

Rubbermaid - Rubbermaid® Large Storage Building Product Demo

Rubbermaid® Large Storage Building Intro

See Flash demo for product images and multimedia.

 

Rubbermaid® Large Storage Building Features

  • View 1

    • Legendary Rubbermaid Durability:

      Rubbermaid's Roughneck shed features double wall construction providing an extra layer of protection for added strength and security. Backed by a 10 year limited lifetime warranty.

    • Leak, Dent and Weather Resistant:

      Quality features like blow molded construction and interlocking panels provide extra impact resistance against harsh weather and the elements.

    • Internal Organization System:

      All Rubbmermaid closet and garage wire shelving found at your local Lowe’s store can be used in this shed. 12 included anchors allow you to hang any combination of shelving, pegboard and accessories from any wall.

    • Lockable:

      Durable metal hasp fits up to 1/4" pad locks providing an extra level of security.
      (Lock not included)

    • Fast, Easy Assembly:

      Assembly

      Large storage shed is easy to assemble using common houshold tools. Can be assembled in about 45 minutes.

    • Maintenance Free:

      Molded in color will not chip or peel and never requires painting.

    • Heavy Duty Floor:

      Heavy duty, impact resistant floor stands up to tough outdoor use.

    • Clutter Free Garage:

      Large shed dimensions optimize space to fit most push lawn mowers while providing extra space for storage needs.

    • Assembly Instructions:

       Assembly Instructions

 

Rubbermaid® Large Storage Building Cutaway

See Flash demo for product images and multimedia.

 

Rubbermaid® Large Storage Building Installation Part 1

  • Step 1

    Click to view printable Installation Instructions

    Build a solid, level surface for the shed foundation. Consult your local building authority for ordinances, restrictions, or permits required before building any structure at your home.

    Note: Minimum dimensions for foundations shown.

  • Step 2

    Using a rubber mallet and screwdriver, punch out the screw holes along the connection edge of both Repeat Floors (B).

    Using a utility knife, cut the long side of each wall slot tab and then use a rubber mallet and screwdriver to knock it out:
    • 4 places on Front Floor (A)
    • 4 places on Repeat Floor (B): middle location
    • 8 places on Repeat Floor (B): rear location

  • Step 3

    Using a rubber mallet and screwdriver, knock out the tabs for the door hinge, 2 places on Front Floor (A).

    Drill pilot hole through top surface of floor, 2 places on Front Floor (A).

    CAUTION: Drill through top surface of floor only!

  • Step 4

    Connect and align middle position Repeat Floor (B) to Front Floor (A) and install Screws (AA) 9 places; keep panels aligned and even while installing screws.

    Connect and align back position Repeat Floor (B) to middle position Repeat Floor (B) and install Screws (AA) 9 places; keep panels aligned and even while installing screws.

    HELPFUL HINT: Pilot holes may be drilled for the screws using a 1/8" drill bit.
    CAUTION: Do not overtighten screws.

  • Step 5

    Using a screwdriver, punch out the screw holes on the top of Repeat Left Side (C) 2 places.

    Snap Repeat Left Side (C) into the back position Repeat Floor (B).

    Hold Repeat Left Side (C) upright to prevent it from falling (until Left Back (D) is installed).

  • Step 6

    Using a screwdriver, punch out the screw holes on the top of Left Back (D) 4 places.

    Connect Left Back (D) into dovetails of Repeat Left Side (C).

    HELPFUL HINT: Lubricate dovetails with liquid soap.

    Engage snaps on bottom of Left Back (D) into Repeat Floor (B).

  • Step 7

    Using a screwdriver, punch out the screw holes on the top of Repeat Right Side (E) 2 places.

    Snap Repeat Right Side (E) into the back position of Repeat Floor (B).

    Hold Repeat Right Side (E) upright to prevent it from falling (until Right Back (F) is installed).

  • Step 8

    Using a screwdriver, punch out the screw holes on the top of Right Back (F) 4 places.

  • Step 9

    Connect Right Back (F) onto dovetails of Repeat Right Side (E). Align the lap joint between Left Back (D) and Right Back (F).

    HELPFUL HINT: Lubricate dovetails with liquid soap.

    Engage snaps on bottom of Right Back (F) into Repeat Floor (B).

  • Step 10

    Install Wall Connector (Q) 5 places, connecting Left Back and Right Back Panels (D and F). Position connectors in slots and slide down to snap in place.

  • Step 11

    Using a screwdriver, punch out the screw holes on the top of Repeat Left Side (C) 2 places.

  • Step 12

    Align the lap joint between back position Repeat Left Side (C) and middle position Repeat Left Side (C).

    Align the lap joint between back position Repeat Left Side (C) and middle position Repeat Left Side (C).

  • Step 13

    Install Wall Connector (Q) 5 places, connecting 2 Repeat Left Sides (C and C). Position connectors in slots and slide down to snap in place.

  • Step 14

    Using a screwdriver, punch out the screw holes on the top of Front Left Side (G) 2 places.

  • Step 15

    Drill a pilot hole (using 1/8" drill bit) in front lower corner at location indicated by screw target.

    Note: This pilot hole is to be drilled through both walls.

    Align the lap joint between Repeat Left Side (C) and Front Left Side (G).

  • Step 16

    Snap Front Left Side (G) into Front Floor (A).

    Install Wall Connector (Q) 5 places, connecting Repeat Left Side (C) and Front Left Side (G). Position connectors in slots and slide down to snap in place.

  • Step 17

    Using a screwdriver, punch out the screw holes on the top of the middle position Repeat Right Side (E) 2 places.

  • Step 18

    Align the lap joint between Repeat Right Side (E) and middle position Repeat Right Side (E).

    Snap middle position Repeat Right Side (E) into the middle position Repeat Floor (B).

 

Rubbermaid® Large Storage Building Installation Part 2

  • Step 19

    Install Wall Connector (Q) 5 places, connecting Repeat Right Side (E) and middle position Repeat Right Side (E). Position connectors in slots and slide down to snap in place.

  • Step 20

    Using a screwdriver, punch out the screw holes on the top of the middle position Front Right Side (H) 2 places.

  • Step 21

    Drill a pilot hole (using 1/8" drill bit) in front lower corner at location indicated by screw target.

    Note: This pilot hole is to be drilled through both walls.

    Align the lap joint between Front Right Side (H) and middle position Repeat Right Side (E).

  • Step 22

    Snap Front Right Side (H) into Front Floor (A).

    Install Wall Connector (Q) 5 places, connecting middle section Repeat Right Side (E) and Front Right Side (H).

  • Step 23

    Install one Repeat Roof (M) onto back section. The overlap edge of roof points toward the back of the shed.

    Align tongues on top of back wall to the outside of the roof panel overlap.

    Align tongues on top of side walls into grooves in roof.

  • Step 24

    Slightly raise front edge of roof enough to allow positioning of Roof Brace (RB) onto the side walls as shown. Lower the roof onto the walls and align Roof Brace (RB) into pocket in Repeat Roof (M).

  • Step 25

    Ensure Repeat Roof (M) is positioned against the back wall tongues. From outside the shed, install one Screw (AA) at each corner. Hold the edge of the roof down firmly at the corners while installing each screw. Install remaining screws into remaining locations of back walls.

    Helpful Hint: Installation is easier using a magnetic bit or starting screws with a manual screwdriver to get seated. Pilot holes also may be drilled using 1/8" bit.

  • Step 26

    From inside the shed, install four Screws (AA) into the roof at each side wall location.

    Note: The screws also have to go through the Roof Brace (RB) at each end to properly secure the roof! A second person on the outside of the shed should hold down the edge of the roof firmly at each screw location.

  • Step 27

    Install one Repeat Roof (M) onto middle section. The overlap edge of roof points toward the back of the shed. Align tongues on top of side walls into grooves in roof.

  • Step 28

    Slightly raise front edge of roof enough to allow positioning of Roof Brace (RB) onto the side walls as shown. Lower the roof onto the walls and align Roof Brace (RB) into pocket in Repeat Roof (M).

  • Step 29

    Make sure middle location Repeat Roof (M) is positioned tightly against the back Repeat Roof (M) section. Install Roof Pins (FF) in four places. If necessary, use Roof Pin Assembly Tool (GG) to pull the roof down.

  • Step 30

    From inside the shed, install four Screws (AA) into the roof at each side wall location.

    Note: The screws also have to go through the Roof Brace (RB) at each end to properly secure the roof!
    A second person on the outside of the shed should hold down the edge of the roof firmly at each screw location.

  • Step 31

    Install one Front Roof (J) onto front section: roof gable edge toward front of shed. Align tongues on top of side walls into grooves in roof.

  • Step 32

    Slightly raise front edge of roof enough to allow positioning of Roof Brace (RB) onto the side walls as shown. Lower the roof onto the walls and align Roof Brace (RB) into pocket in Front Roof (J).

  • Step 33

    Make sure Front Roof (J) is positioned tightly against the middle Repeat Roof (M) section. Install Roof Pins (FF) in four places. If necessary, use Roof Pin Assembly Tool (GG) to pull the roof down.

  • Step 34

    Install Left Door (L) and Right Door (K) into hinge openings of Front Floor (A) and hinge sockets in Front Roof (J).

    Note: Only raise front edge of roof enough to install the door hinge pins.

    From inside the shed, install four Screws (AA) into the roof at each side wall location.

    Note: The screws also have to go through the Roof Brace (RB) at each end to properly secure the roof! A second person on the outside of the shed should hold down the edge of the roof firmly at each screw location.

  • Step 35

    Install Screws (AA) into 10 locations shown at bottom of wall panels to secure walls to floor.

    HELPFUL HINT: Pilot holes may be drilled for the screws.
    CAUTION: Do not overtighten screws.

  • Step 36

    Install Lock Hasp (X) into opening on Right Door (K).

    Install Door Handle (T) onto Left Door (L) using four Screws (AA).

 

Easy2 Technologies