Loading

Rubbermaid - Rubbermaid® Small Storage Shed Product Demo

Rubbermaid® Small Storage Shed Intro

See Flash demo for product images and multimedia.

 

Rubbermaid® Small Storage Shed Features

  • View 1

    • Legendary Rubbermaid Durability:

      Rubbermaid's Roughneck shed features double wall construction providing an extra layer of protection for added strength and security. Backed by a 10 year limited lifetime warranty.

    • Leak, Dent and Weather Resistant:

      Quality features like blow molded construction and interlocking panels provide extra impact resistance against harsh weather and the elements.

    • Internal Organization System:

      All Rubbmermaid closet and garage wire shelving found at your local Lowe’s store can be used in this shed. 4 included anchors allow you to hang any combination of shelving, pegboard and accessories from any wall.

    • Lockable:

      Durable metal hasp fits up to 1/4" pad locks providing an extra level of security.
      (Lock not included)

    • Fast, Easy Assembly:

      Assembly

      Small storage shed is easy to assemble using common houshold tools. Can be assembled in about 15 minutes.

    • Maintenance Free:

      Molded in color will not chip or peel and never requires painting.

    • Heavy Duty Floor:

      Heavy duty, impact resistant floor stands up to tough outdoor use.

    • Clutter Free Garage:

      Small shed dimensions optimize space for long handled tools providing extra space for storage needs.

 

Rubbermaid® Small Storage Shed Cutaway

See Flash demo for product images and multimedia.

 

Rubbermaid® Small Storage Shed Installation

  • Step 1

    Click to view printable Installation Instructions

    Build a solid, level surface for the shed foundation. Consult your local building authority for ordinances, restrictions, or permits required before building any structure at your home.

    Note: Minimum dim ensions for foundations shown.

  • Step 2

    FLOOR PLAN: Size the construction site to fit the entire floor.

    OPTIONAL STEP: If desired, recessed anchor locations (5 places) can be used to anchor the shed floor to a foundation after you have constructed one.

  • Step 3

    Using a utility knife, cut the long side of each wall slot tab and then use a rubber mallet and screwdriver to knock it out 8 places on Front Floor (A).

    Using a rubber mallet and screwdriver, knock out the tabs for the door hinge, 2 places on Front Floor (A).

  • Step 4

    Drill pilot hole through top surface of floor, 2 places on Front Floor (A).

    CAUTION: Drill through top surface of floor only!

  • Step 5

    Using a screwdriver, punch out the screw holes on the top of Front Left Side (G) 2 places.

  • Step 6

    Drill a pilot hole (using 1/8" drill bit) in front lower corner at location indicated by screw target.

    Note: This pilot hole is to be drilled through both walls.

    Snap Front Left Side (G) into Front Floor (A). Hold Front Left Side (G) upright to prevent it from falling (until Left Back (D) is installed).

  • Step 7

    Using a screwdriver, punch out the screw holes on the top of Left Back (D) 4 places.

  • Step 8

    Connect Left Back (D) into dovetails of Front Left Side (G).

    HELPFUL HINT: Lubricate dovetails with liquid soap.

    Engage snaps on bottom of Left Back (D) into Front Floor (A).

  • Step 9

    Using a screwdriver, punch out the screw holes on the top of Front Right Side (H) 2 places.

  • Step 10

    Drill a pilot hole (using 1/8" drill bit) in front lower corner at location indicated by screw target.

    Note: This pilot hole is to be drilled through both walls.

    Snap Front Right Side (H) into Front Floor (A). Hold Front Right Side (H) upright to prevent it from falling (until Right Back (F) is installed).

  • Step 11

    Using a screwdriver, punch out the screw holes on the top of Right Back (F) 4 places.

  • Step 12

    Connect Right Back (F) onto dovetails of Front Right Side (H). Align the lap joint between Left Back (D) and Right Back (F).

    HELPFUL HINT: Lubricate dovetails with liquid soap.

    Engage snaps on bottom of Right Back (F) into Front Floor (A).

  • Step 13

    Install Wall Connector (Q) 5 places, connecting Left Back and Right Back Panels (D and F). Position connectors in slots and slide down to snap in place.

  • Step 14

    Install Front Roof (J) onto side sections. Align tongues on top of side walls into grooves in roof.

    Slightly raise front edge of roof enough to allow positioning of Roof Brace (RB) onto the side walls as shown. Lower the roof onto the walls and align Roof Brace (RB) into pocket in Front Roof (J).

  • Step 15

    Ensure Front Roof (J) is positioned against the back wall tongues. From outside the shed, install one Screw (AA) at each corner. Hold the edge of the roof down firmly at the corners while installing each screw. Install remaining screws into remaining locations of back walls.

    Helpful Hint: Installation is easier using a magnetic bit or starting screws with a manual screwdriver to get seated. Pilot holes also may be drilled using 1/8" bit.

  • Step 16

    Install Left Door (L) and Right Door (K) into hinge openings of Front Floor (A) and hinge sockets in Front Roof (J).

    Note: Only raise front edge of roof enough to install the door hinge pins.

    From inside the shed, install four Screws (AA) into the roof, two on each side wall.

    Note: The screws also have to go through the Roof Brace (RB) at each end to properly secure the roof! A second person on the outside of the shed should hold down the edge of the roof firmly at each screw location.

  • Step 17

    Install Screws (AA) into 6 locations shown at bottom of wall panels to secure walls to floor.

    HELPFUL HINT: Pilot holes may be drilled for the screws.
    CAUTION: Do not overtighten screws.

  • Step 18

    Install Lock Hasp (X) into opening on Right Door (K).

    Install Door Handle (T) onto Left Door (L) using four Screws (AA).

 

Easy2 Technologies