Loading

Fiber Composites, LLC - Pre-Installation Planning Product Demo

Pre-Installation Planning Instructions

  • Introduction
    • Fiberon Horizon Composite Railing
    • It’s All In The Box
    • Prefabricated
    • Highest Quality Components
    • Beautiful Designs
    • Durable surfaces keep a “freshly painted” look for years.
  • Tools & Parts
    • 10- or 12-Inch Chop Saw With 32-Tooth Carbide-Tipped Blade
    • Cordless Drill/Driver (Square Bits Are Provided)
    • 1/8- & 1/16-Inch Drill Bits
    • Flex Shaft Drill Attachment
    • 1-inch Blue Masking Tape
    • Fine Point Markers
    • PVC Cement
    • 3/8 by 3 inch or 3/8 by 4 inch Galvanized Carriage Bolts (If Using Joist Mount Brackets)
    • Clear Silicone (Optional For Temporary Post Attachment) 

    If you are mounting ClearVisionSystem panels, you will need these additional tools: 

    • 80-Tooth Carbide Blade
    • Block Plane, Sureform Plane or Coarse Sanding Block
    • Liquid Dish Soap & Spray Bottle With Cold Water 
    • Standard System
    • Order Parts For Custom Railings

     

  • Fiberon Solutions
    • We’ve Got The Options & Answers
    • Joist Mount Brackets (Attach Directly To Framing)
    • Surface Mount Brackets For Wood Surfaces
    • Surface Mount Brackets For Concrete Surfaces
    • Standalone Post
    • Post Sleeve Over Wood
    • Load-Bearing Colonial Column
    • Line Brackets For In Line Applications
    • Angle Brackets for 45-degree angle installations
    • Adjustable Stair Brackets for stair rail applications.
    • Mission
    • Provincial
    • Square Balusters
    • Colonial Spindles
    • ClearVisionSystem
    • Bevel Cap
    • Harbour Cap
    • Post Cove Moulding

     

  • Conclusion

    • Read Instructions
    • Call 704-463-7120 To Reach a Fiberon Warranty Services Rep

 

Easy2 Technologies